2025 Q2 Goal Recap

It's summer again! It was snowing out when I published my Q2 goals and today it was sunny and hot! I'm spending time outside biking and walking and time inside bowling. I didn't work on a lot of different projects this quarter, but I finished two old WIPS which is always a joy. Quilt Tally WIP List to Start the Quarter: 10 WIP List to End the Quarter: 11 Active QAL Projects: 1 Untouched in 2025: 5 Finished in Q2: 4 quilts, 1 cross-stitch project, 7 small projects A look back at my goals for Q2 : 2025 Q2 Goal 1: Start a New Leaders and Enders Project I started a new one and it's also blue! Instead of a four patch design , I'm doing a coin layout with blue and low volume scraps. I'm currently piecing them into sets of four, then planning on turning them into blocks of eight before sewing the whole top together. This one isn't worried about unique fabrics (I'm cutting as many rectangles as possible...